Pump out and truck away more than 500,000 gallons of water to a designated sanitary sewer manhole three miles away from the job site. Remove and replace existing pond liners including the excavation and hauling of sediment on top of the exisiting pond liners.
- Pumping out incoming groundwater and rainwater 24/7
- Properly removing and relocating the wildlife that occuiped the ponds
- Design and implementation of a water control plan to ensure 5.5 million gallons of additional water in the closed loop system was properly diverted from the work area during construction